Thermo Fisher Logo

Freezer & Clean Rooms


Our Thermal Solutions team brought on to help design and build (3) non-classified -20 deg Freezer rooms and (3) ISO 7 Grade C clean cold chromatography rooms. Our team designed custom mechanical systems that can be serviced outside the clean room environment. We were still able to meet the project deadline, even while navigating the supply chain crisis.

Project Gold Rush Photos

Project Gold Rush Photos

TriLink Freezer Rooms


Our Thermal Solutions team was hired to design and build two GMP (2) +4 / -20 deg C cold / freezer rooms with +/- 1 deg uniformit. We collaborated with trades in BIM and onsite to optimize the installation phase (due to space and size constraints). Full Spectrum Group staffed the project with special considerations (multiple foremans) in order to meet the aggressive project deadline.

TriLink Project Photo

TriLink Project Photo

Pacira Logo

Custom Cold Rooms


Our Thermal Solutions team was hired to design and build some non-classified and classified cold rooms in a couple of separate phases of work. Despite an accelerated schedule, we were able to find space and cost saving solutions during the design and installation phases of the project. Our engineers came up with the idea to place the condensing units in the organization’s parking garage to lower noise and heat rejection.